Schematic diagram of Hillingdon network adapted from SSEN Distribution Data Portal for the study in paper "A Real-World Case Study Towards Net Zero: EV Charger and Heat Pump Integration in End-User Residential Distribution Networks"
The base power network for the study in "A Real-World Case Study Towards Net Zero: EV Charger and Heat Pump Integration in End-User Residential Distribution Networks" is the 11kV circuit of Hillingdon substation (33/11kV, 40MVA) adapted from Scottish and Southern Energy Networks (SSEN) Distribution Data Portal. It has 9 feeders.